ISO 9001 ISO 14001 ISO 45001 TKDN
Modern Industrial Genset Solutions

Stable Power for 24/7 Operations

Unit supply, installation, commissioning, and service contracts for industry, infrastructure, and EPC projects.

Engineering & Compliance

Well-Structured ATS/AMF & Synchronizing

Panel integration, load sharing, FAT/SAT, documentation, and operator training.

Service & Parts

Fast Response, Minimal Downtime

Preventive maintenance, overhaul, and spare parts support for long-term reliability.

Blog & Insight

Artikel

Panduan teknis, tips operasional, dan info terkini seputar genset industrial.

Home Artikel
Technical Guide 7 min read March 20, 2025

Starting Watts: The Hidden Load That Most Often Trips a Genset

JERBINDO POWER SYSTEMS
Technical & Education Team

Quick Answer

Motor-driven equipment draws a 2-7x power surge when first switched on. This is often overlooked and is a leading cause of sudden genset trips. Learn how to calculate it and the technical solutions available.

You've carefully calculated all your running watts — a total of 5 kW. You buy a 6 kVA genset just to be safe. Then, when the AC turns on, the genset trips instantly. What happened? The answer: starting watts.

What Are Starting Watts?

Equipment with electric motors requires a large momentary power surge the instant it's switched on. This phenomenon is called inrush current, or Locked Rotor Amps (LRA). During the first 0.1–2 seconds, a motor can draw 2–7 times more current than its normal running current. A genset that can't handle this surge will trip instantly or suffer a severe voltage drop.

Surge Factors by Equipment Type

  • AC units / refrigeration compressors: 3–7× running watts — the most common cause of genset trips
  • Large industrial motors: 3–6× running watts
  • Water pumps: 2–3× running watts
  • Refrigerators / freezers: 2–3× running watts
  • LED / resistive lighting: ~1× — no meaningful starting surge

How to Correctly Calculate Peak Load

Peak Load = Σ Running Watts of all loads + Starting Watts of the largest motor

Example: 10 lights (500 W) + a 750 W pump + 900 W AC running + AC starting surge (3×900 = 2,700 W) = 4,850 W peak. A 4 kW genset is clearly insufficient even though total running watts is only 2,150 W.

Technical Solutions

  • Soft Starter: Reduces motor starting current by 40–60%. Suitable for pumps and compressors.
  • VFD (Variable Frequency Drive): Ramps up motor speed gradually, nearly eliminating inrush current.
  • Staggered Startup: Don't switch on all motors at once — leave a 30–60 second gap between each motor.
  • Oversize the genset: Choose a capacity 20–30% larger than total running watts alone.

Use the Jerbindo load simulator, which automatically accounts for the starting-watts factor for every piece of equipment you enter.

starting wattsinrush currentmotor listrikgenset trip
Share: WhatsApp

Quick FAQ

Motor-driven equipment draws a 2-7x power surge when first switched on. This is often overlooked and is a leading cause of sudden genset trips. Learn how to calculate it and the technical solutions available.
Start with an audit of existing conditions, validate the technical parameters, then translate them into an implementation and maintenance checklist.
When your needs involve kVA sizing, ATS/AMF, synchronizing, or when there's a gap between field requirements and unit specifications.
Need Technical Consultation?
Jerbindo's engineering team is ready to help with your genset needs.
Contact Us

Related Articles

What's the Difference Between ATS and AMF in Backup Power Systems?
ATS (Automatic Transfer Switch) and AMF (Automatic Mains Failure) are often confused, yet they serve different functions. This article breaks down the fundamental differences, how each unit works, when to use ATS versus AMF, and how the two integrate into one reliable backup power system for industrial facilities.
8 min read · April 8, 2026
Read More
When Does a Genset Need Synchronizing and Load Sharing?
As electrical load grows or redundancy becomes critical, operators need to consider a synchronizing and load-sharing system. This article covers the basic principles of synchronization, signs your facility needs a parallel system, how load sharing works, and the risks of getting it wrong.
9 min read · April 8, 2026
Read More
The Role of LV and MV Panels in Industrial Power Systems
LV and MV panels play a vital role in industrial power distribution. Understand the fundamental differences between the two, when to upgrade from LV to MV, and how they integrate with genset synchronizing systems to ensure operational reliability.
8 min read · April 8, 2026
Read More
← Previous Article
kVA vs. kW: Why Gensets Are Rated in kVA, Not kW
Next Article →
5 Steps to Choosing the Right Genset Capacity and Avoiding a Costly Mistake

Related Solutions