One Outage Can Cost Billions of Rupiah
Without a reliable backup system, every grid outage is a direct threat to your productivity and assets.
Slow Manual Switching
Manually switching to backup power can take several minutes — long enough to damage equipment and lose production data.
Unintegrated Fuel System
A genset stops mid-operation because the fuel system isn't synchronized — a real danger for medical facilities, data centers, and manufacturing.
Non-Standard Installation
A carelessly installed system creates safety risks and makes future troubleshooting more expensive and time-consuming.
No Technical Documentation
Without as-built drawings and complete documentation, every repair or system expansion becomes a high-risk guessing game.
Our Integrated Solution
We design, supply, and install backup power systems that work automatically, are fully documented, and are ready for full operation from commissioning onward.
Backup Power Solution Components
Every component is selected and configured to work together — not a collection of separate products.
Industrial-Grade Genset
Procurement and installation of gensets from trusted brands, from 10 kVA up to multi-MW capacity. Single or parallel configuration to match your power needs.
GensetAutomatic ATS/AMF Panel
An Automatic Transfer Switch and Automatic Main Failure panel that detects a grid outage and transfers the load to the genset in under 10 seconds — with no manual intervention.
ATS/AMFIntegrated Fuel System
Day tank, bulk tank, fuel transfer pump, level sensor, and alarm system working together to ensure your genset never runs out of fuel when it's needed most.
Fuel SystemsTurnkey Installation
From the genset foundation, cable trays, and power cables to the earthing system — everything is done to PUIL and IEC standards and OEM specifications, with a guarantee of neatness and safety.
InstallationRemote Monitoring
A control panel with SCADA or a GSM module lets you monitor genset status, fuel level, and alarms in real time from anywhere.
MonitoringComplete Documentation
Single line diagram, wiring diagram, as-built drawing, operating manual, and commissioning report are all provided for every project — a valuable asset for long-term operations.
DocumentationSystem Parameters & Capabilities
The system is designed to international standards and can be customized for any field condition.
| Parameter | Specification | Standard | Available |
|---|---|---|---|
| Genset Capacity | 10 kVA – Multi-MW (single & parallel) | ISO 8528 | ✓ Yes |
| ATS Transfer Time | < 10 seconds (configurable) | IEC 60947-6-1 | ✓ Yes |
| Fuel Tank Capacity | Customized (day tank + bulk tank) | NFPA 110 | ✓ Yes |
| System Voltage | Low Voltage (380–415V) / Medium Voltage | PLN / IEC | ✓ Yes |
| Genset Protection | Over/under voltage, frequency, overcurrent, overload | IEC 60255 | ✓ Yes |
| Remote Monitoring | GSM / Ethernet / SCADA compatible | Modbus RTU/TCP | ✓ Yes |
| Installation Standard | PUIL 2011, IEC 60364, OEM Standard | SNI / IEC | ✓ Yes |
From Consultation to Handover
A structured process ensures nothing is missed — from initial assessment to full system operation.
Site Survey & Assessment
A field visit to understand your power needs, existing conditions, and your site's technical constraints.
Engineering & Proposal
Complete system design with a single line diagram, bill of materials, and a transparent cost estimate.
Procurement & Installation
Equipment procurement from trusted vendors and installation by certified technicians under close supervision.
Commissioning & Handover
Load testing, protection testing, operator training, and complete document handover for your team.
Trusted by Industry, Proven in the Field
The backup power systems we've built now keep various industrial facilities running across Indonesia.
"The ATS/AMF installed by the Jerbindo team worked perfectly when the grid went down at night. Night shift production wasn't disrupted at all. The switching really was a matter of seconds."
"We'd tried other vendors before. Jerbindo's biggest difference is in the documentation — all as-built drawings were provided complete and accurate. It's been a huge help to our maintenance team."
"The fuel management system they designed for our 4 parallel genset units has worked without issue for 18 months. We haven't had a fuel shortage incident since installation."
Frequently Asked Questions
We answer your technical questions before the project starts — not after.